API RP 92M – Managed Pressure Drilling Operations with Surface Back-pressure First Edition Includes Errata 1 (2017) Errata 2 (2023) and Addendum 1 (2023)
This document provides information for planning installation testing and operation of wells drilled with surface back-pressure managed pressure drilling (MPD). This document applies only to drilling rigs with surface blowout preventers (BOPs).
This document considers situations where the total drilling operation is performed balanced or overbalanced including both hydrostatically overbalanced (no supplemental surface pressure needed to control inflow) and hydrostatically underbalanced (supplemental surface pressure needed to control inflow) systems.
This document does not cover MPD operations with subsea BOP stacks.
Product Details
- Edition:
- 1st
- Published:
- 09/01/2017
- Number of Pages:
- 61
- File Size:
- 1 file 1.4 MB
- Product Code(s):
- G92M01 G92M01 G92M01
- Note:
- This product is unavailable in Russia Cuba Syria North Korea Ukraine Belarus Iran